Customer and Jinchun team conducting a factory acceptance review

Project evidence

Show the process.
Prove the result.

Use real discussions, trial runs, sample checks, and factory acceptance test (FAT) records to reduce uncertainty before shipment.

Four evidence points
before delivery.

The exact record and acceptance scope depend on the machine and project.

Customer and Jinchun team reviewing a production requirement01
Requirement review

Confirm the Production Requirement

Review the drawing or sample, material, wire diameter, required process and output target before configuration.

Customer observing Jinchun equipment during trial production02
Trial production

Run the Proposed Process

Observe operation and confirm that the proposed sequence can produce the required form.

Trial-produced wire sample being measured03
Sample check

Check the Finished Sample

Compare the trial sample with the agreed geometry and acceptance criteria before final approval.

Customer and Jinchun team conducting factory acceptance review04
FAT review

Complete Factory Acceptance

Review operation, samples and agreed acceptance items before the equipment is prepared for delivery.

Specific customer names, countries, production figures and project results are published only after internal verification and any required authorization.

Make acceptance
measurable.

A useful project record links the product, process, equipment and agreed acceptance criteria.

01

Product

Approved drawing, sample or geometry.

02

Process

Configured operating sequence and tooling.

03

Evidence

Trial record, measurements and observations.

04

Acceptance

Agreed checklist and final review.

Define evidence before equipment.

Tell us which dimensions, functions and records matter to your project.

Discuss Acceptance Criteria →