30+ years in wire forming automationlinus@jinchunmetalform.com·WhatsApp +1 702 268 1937
Jinchun wire forming machine workshop in Foshan

Manufacturing control

Built and tested
under one roof.

Engineering, manufacturing, assembly, controls integration, trial production and inspection stay connected inside one manufacturing system.

30+Years of engineering
20,000 m²Integrated facility
50+Markets served
24hInitial response

One connected
manufacturing system.

Keeping engineering and manufacturing connected makes trial results and design changes easier to communicate.

01

Engineering & Process Planning

Review the product, sequence, tooling, interfaces and layout before configuration.

02

In-house Machining & Tooling

Coordinate manufactured parts and tooling with the approved machine design.

03

Assembly & Controls

Assemble the mechanical, electrical and control systems as one configured machine.

04

Trial & Inspection

Run samples and inspect agreed items before the equipment is prepared for delivery.

Evidence before
equipment leaves.

Factory acceptance test (FAT) scope and acceptance criteria are agreed per project.

Material and wire dimension inspection
Input

Diagnose

Review geometry, material, wire diameter, output and constraints.

Engineer reviewing design and tooling
Design

Engineer

Define process, tooling, configuration, layout and controls.

Engineer checking a trial-produced wire sample
Proof

Validate

Build, test and compare the equipment with agreed sample criteria.

Customer and engineer reviewing equipment during acceptance
Output

Launch

Prepare delivery, commissioning, training and production support.

See how the solution will be validated.

Share the product and acceptance priorities with our engineering team.

Start an Engineering Review →
WA