01Confirm the Production Requirement
Review the drawing or sample, material, wire diameter, required process and output target before configuration.

Project evidence
Use real discussions, trial runs, sample checks, and factory acceptance test (FAT) records to reduce uncertainty before shipment.
The exact record and acceptance scope depend on the machine and project.
01Review the drawing or sample, material, wire diameter, required process and output target before configuration.
02Observe operation and confirm that the proposed sequence can produce the required form.
03Compare the trial sample with the agreed geometry and acceptance criteria before final approval.
04Review operation, samples and agreed acceptance items before the equipment is prepared for delivery.
Specific customer names, countries, production figures and project results are published only after internal verification and any required authorization.
A useful project record links the product, process, equipment and agreed acceptance criteria.
Approved drawing, sample or geometry.
Configured operating sequence and tooling.
Trial record, measurements and observations.
Agreed checklist and final review.
Tell us which dimensions, functions and records matter to your project.